Problem Statement (Relevance). In recent years, emulsion explosives of domestic production became widely introduced. They are safer in operation and surpass TNT-containing explosives in their energy characteristics. This is an urgent task at the present stage of development of the world's mining enterprises. Methods Used. The authors described the technology of a new technological solution for providing the rationale and selecting reasonable parameters for drilling and blasting operations using emulsion explosives during development workings. They included an analysis of the mining and geological conditions of the deposit and the development of stopes using pillar-and-breast systems and backfilling of the worked-out area, the technology of drilling and blasting used when conducting horizontal and inclined (up to 12°) mine workings and theoretical studies, which were carried out using a mathematical modeling method. Novelty. The authors developed a concept of providing the rationale and selecting reasonable parameters of drilling and blasting parameters for horizontal mine workings using high-performance self-propelled equipment and the use of emulsion explosives, as well as taking into account their energy characteristics and physical and mechanical properties of rocks. Result. The use of emulsion explosives of the Ukrainit-P-SA type will make it possible to reduce the number of holes in the working face down to 12% in comparison with the use of the Ammonit No. 6 ZhV explosives. The consumption of explosives, when using a blasting pattern and the Ukrainit-P-SA explosives, will decrease to 6%. These indicators indicate the need for using emulsion explosives of the Ukrainit-P-SA type, when carrying out preparatory and temporary workings by drilling and blasting, as well as the use of high-performance tunneling equipment in tunneling operations. The expected economic potential, obtained as a result of a technical and economic comparison for the main items of cost calculation, indicates the feasibility of introducing the developed technological solution. Practical Relevance. The conducted research contribute to reducing the cost of 1 m of mining to 11%, as well as to saving resources in the production of mining operations and increasing the speed of mining at the Zaporizhzhya Iron Ore Plant private joint stock company (PJSC ZZRK), Ukraine, to 200 m per month. This also contributes to increasing efficiency of extraction of ore raw materials for ferrous and non-ferrous metallurgy.

Keywords

Emulsion explosives, blasting pattern, tunneling equipment, self-propelled drilling rig, load haul dumper, charging installation.

For citation

Khomenko O.E., Kononenko M.N., Lyashenko V.I. Rationale for Technologies and Facilities for Carrying out Horizontal Mine Workings Using Emulsion Explosives. Vestnik Magnitogorskogo Gosudarstvennogo Tekhnicheskogo Universiteta im. G.I. Nosova [Vestnik of Nosov Magnitogorsk State Technical University]. 2021, vol. 19, no. 3, pp. 5–15. https://doi.org/10.18503/1995-2732-2021-19-3-5-15

Oleg E. Khomenko – DrSc (Eng.), Professor of the Department of Mining Engineering and Education, National Technical University Dnipro University of Technology, Dnipro, Ukraine. Email: This email address is being protected from spambots. You need JavaScript enabled to view it..

Maksim N. Kononenko – PhD (Eng.), Associate Professor of the Department of Mining Engineering and Education, National Technical University Dnipro University of Technology, Dnipro, Ukraine. Email: This email address is being protected from spambots. You need JavaScript enabled to view it..

Vasiliy I. Lyashenko – PhD (Eng.), Senior Researcher, Head of the Research Department, State Enterprise Ukrainian Research and Design Institute of Industrial Technology, Zhovti Vody, Ukraine. Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

1. Chernov A.P. Dobycha i pererabotka uranovykh rud v Ukraine: monografiya [Mining and processing of uranium ores in Ukraine: Monograph]. Kiev: ADEF-Ukraine, 2001, 238 p. (In Russ.)

2. Kutuzov B.N., Belin V.A. Proektirovanie i organizatsiya vzryvnykh rabot [Design and organization of blasting operations]. Moscow: Sholokhov Moscow State University for Humanities, 2011, 410 p. (In Russ.)

3. Sivenkov V.I., Ilyakhin S.V., Maslov I.Yu. Emulsionnye vzryvchatye veshchestva i neelektricheskie sistemy initsiirovaniya [Emulsion explosives and non-electric detonation systems]. Moscow: Shchit-M, 2013, 320 p. (In Russ.)

4. Trubetskoy K.N., Zakharov V.N., Viktorov S.D., Zharikov I.F., Zakalinsky V.M. Explosive destruction of rocks during the development of subsoil. Problemy nedropolzovaniya [Problems of Subsoil Use], 2014, no. 3, pp. 80–95. (In Russ.)

5. Gorova A., Kolesnyk V., Myronova I. Increasing of environmental safety level during underground mining of iron ores. Mining of Mineral Deposits, 2014, 8(4), 473–479. http://doi.org/10.15407/mining08.04.473

6. Mironova I., Borysovs’ka O. Defining the parameters of the atmospheric air for iron ore mines. Progressive Technologies of Coal, Coalbed Methane, and Ores Mining, 2014, 333–339. http://doi.org/10.1201/ b17547-57

7. Myronova I. The level of atmospheric pollution around the iron-ore mine. New Developments in Mining Engineering, 2015, 193–197. http://doi.org/10.1201/ b19901-35

8. Kholodenko T., Ustimenko Y., Pidkamenna L., Pavlychenko A. Ecological safety of emulsion explosives use at mining enterprises. Progressive Technologies of Coal, Coalbed Methane, and Ores Mining, 2014, 255–260. http://doi.org/10.1201/ b17547-45

9. Kholodenko T., Ustimenko Y., Pidkamenna L., Pavlychenko A. (2015). Technical, economic and environmental aspects of the use of emulsion explosives by ERA brand in underground and surface mining. New Developments in Mining Engineering, 2015, 211–219. http://doi.org/10.1201/b19901-38

10. Khomenko O., Kononenko M., Myronova I., Savchenko M. Application of the emulsion explosives in the tunnels construction. E3S Web of Conferences, 2019, 123, 01039. http://doi.org/10.1051/e3sconf/ 201912301039

11. Ilyakhin S.V., Norov A.Yu., Yakshibaev T.M. Determination of the radius of the rock mass crack formation zones during a camouflet explosion. Vzryvnoe delo [Explosion Technology], 2016, no. 116/73, pp. 29–36. (In Russ.)

12. Overchenko M.N., Mozer S.P., Galushko F.I., Lunkov A.G. Development of presplit blasting schemes for driving underground workings. Vzryvnoe delo [Explosion Technology], 2016, no. 115/72, pp. 202–214. (In Russ.)

13. Grinev V.G., Khorolsky A.A. A decision support system for the development of mineral deposits. Gorno-geologicheskiy zhurnal [Mining and Geological Journal], 2017, 51 (3), pp. 18–24. (In Russ.)

14. Khorolsky A.A., Grinev V.G. The choice of a scenario for the development of mineral deposits. Geologiya i okhrana nedr [Geology and Protection of Mineral Resources], 2018, (3), pp. 68–75. (In Russ.)

15. Shevtsov N.R., Taranov P.Ya., Levit V.V., Gudz A.G. Razrushenie gornykh porod vzryvom [The destruction of rocks by the explosion]. Donetsk: DonNTU, 2003, 253 p. (In Russ.)

16. Merkulov A.V., Silchenko Yu.A., Skorikov V.A. Proektirovanie pasportov burovzryvnykh rabot pri prokhodke gornykh vyrabotok [Designing of blasting patterns during mining operations]. Novocherkassk: Shakhty Institute of SRSTU, 2003, 90 p. (In Russ.)

17. Onika S.G., Stasevich V.I., Kovaleva I.M. Razrushenie gornykh porod vzryvom [Destruction of rocks by explosion]. Minsk: BNTU, 2016, 168 p. (In Russ.)

18. Khomenko O., Rudakov D., Kononenko M. Automation of drill and blast design. Technical and Geoinformational Systems in Mining, 2011, 271–275. http://doi.org/10.1201/b11586-45

19. Khomenko O.E., Kononenko M.M., Savchenko M.V. Tekhnologiya podzemnoy razrabotki rudnykh mestorozhdeniy [Technology of underground mining of ore deposits]. Dnipro: NTU DP, 2018, 449 p. http://doi.org/10.33271/dut.001

20. Lyashenko V.I., Khomenko O.E., Kononenko M.N. Substantiation of parameters of mine working drivage with blasting technique and cleaning charges in advance cutting holes. Gornye nauki i tekhnologii [Mining Science and Technology], 2020, vol. 5, no. 4,pp. 336–348. http://doi.org/10.17073/2500-0632-2020-4-336-348

21. Kononenko M., Khomenko O., Savchenko M., Kovalenko I. Method for calculation of drilling-and-blasting operations parameters for emulsion explosives. Mining of Mineral Deposits, 2019, 13(3), 22–30. https://doi.org/10.33271/mining13.03.022

22. Lyashenko V., Vorob’ev A., Nebohin V., Vorob’ev K. Improving the efficiency of blasting operations in mines with the help of emulsion explosives. Mining of Mineral Deposits, 2018, 12(1), 95–102. https://doi.org/10.15407/ mining12.01.095

23. Lyashenko V.I., Khomenko O.E., Kislyi P.A. Improving of seismic safety of rocky deposits underground mining based on new charges of explosives application. Ferrous Metallurgy. Bulletin of Scientific, Technical and Economic Information, 2019, 75(8), 912–922. https://doi.org/10.32339/0135-5910-2019-8-912-922

24. Umarov F.Ya., Nasirov U.F., Nutfulloev G.S., Nazarov Z.S., Sharipov L.O. Increasing the efficiency of driving underground mine workings using blast-hole charges with a cumulative effect. Izvestiya vuzov. Gorny zhurnal. [News of Higher Educational Institutions. Mining Journal.], 2020, no. 3, pp. 15–23. DOI: 10.21440 / 0536-1028-2020-3-15-23