Abstract

The relevance of the research. Since the transition from open-pit to underground mining is usually characterized by a significant decrease of mining enterprise efficiency, a very urgent scientific and technical task is to find and justify an underground geotechnology for mining under-pit reserves, which allows minimizing economic damage in the transition period. Objectives. Substantiation of the parameters of underground geotechnology, taking into account geological and mining factors that affect the efficiency of the mining during the transition from open-pit mining in difficult economic conditions and the tightening of environmental safety requirements. Methods. An economic and mathematical modeling tool was used to simulate the process of mining the transitional zone of an ore deposit, to investigate the functioning of individual technological processes and to predict the technical and economic indicators of underground geotechnology. Results.The influence of the level height on the ore extraction indicators was studied for various options for mining systems. In order to improve ore extraction and preserve the surface, a variant of a sub-level open stoping with dry stowing and an ascending order of extraction of under-pit reserves has been developed. The dependences of the influence of the level height in the transition zone, which varies in the range from 40 to 100 m, and the production capacity of the enterprise in the transition period, which varies from 0.8 to 2.4 million tons per year on the main technical and economic indicators of the mining of under-pit reserves are established. Conclusions.It has been determined that the proposed technology, in comparison with the traditional one, is much more efficient in terms of losses, dilution and the cost of ore extraction, despite the worse labor productivity in the main processes of mining. The best technical and economic indicators are achieved with a level height of 40 m and a mine production capacity of 1.6 million tons per year.

Keywords

under-pit reserves, mining system, technical and economic indicators, level height, production capacity, cost of ore mining.

For citation

Antipin Yu.G., Baranovsky K.V., Rozhkov A.A., Nikitin I.V., Solomein Yu.M. Optimization of Underground Geotechnology Parameters for the Mining of Under-Pit Reserves of ore Deposits by the Method of Economic and Mathematical Modeling.Vestnik Magnitogorskogo Gosudarstvennogo Tekhnicheskogo Universiteta im. G.I. Nosova [Vestnik of Nosov Magnitogorsk State Technical University]. 2022, vol. 20, no. 2, pp. 23–35. https://doi.org/10.18503/1995-2732-2022-20-2-23-35

Antipin Yu.G. Institute of Mining Ural Branch of Russian Academy of Sciences, Yekaterinburg, Russia

Baranovsky K.V. Institute of Mining Ural Branch of Russian Academy of Sciences, Yekaterinburg, Russia

Rozhkov A.A. Institute of Mining Ural Branch of Russian Academy of Sciences, Yekaterinburg, Russia

Nikitin I.V. Institute of Mining Ural Branch of Russian Academy of Sciences, Yekaterinburg, Russia

Solomein Yu.M. Institute of Mining Ural Branch of Russian Academy of Sciences, Yekaterinburg, Russia

1. Karakus M., Zhukovskiy S., Goodchild D. Investigating the influence of underground ore productions on the overall stability of an existing open pit. Procedia Engineering, 2017, vol. 191, pp. 600–608.

2. Sokolov I.V., Antipin Yu.G., Rozhkov A.A., Nikitin I.V., Solomein Yu.M. Mining factors effect on the technical and economic indicators of mining the upper sublevel under the rock cushion at iron ore deposits. Izvestiya vysshikh uchebnykh zavedenii. Gornyi zhurnal [Minerals and Mining Engineering], 2021, no. 8, pp. 5–14. DOI: 10.21440/0536-1028-2021-8-5-14

3. Kalmykov V.N., Gavrishev S.E., Burmistrov K.V., Gogotin A.A., Petrova O.V., Tomilina N.G. New underground mining approaches justification for the Maliy Kuybas open pit mining operations. Gorny informatsionno-analiticheskiy byulleten (nauchno-tekhnichesky zhurnal) [Mining Informational and Analytical Bulletin (Scientific and Technical Journal)], 2013, no. 4, pp. 132–139. (In Russ.)

4. King B., Goycoolea М., Newman A. Optimizing the open pit-to-underground mining transition. European Journal of Operational Research, 2017, vol. 257, no. 1, pp. 297–309.

5. Whittle D., Brazil M., Grossman P., Rubinstein H., Thomas D. Combined optimisation of an open-pit mine outline and the transition depth to underground mining. European Journal of Operational Research, 2018, vol. 268, no. 2, pp., 624-634. DOI: 10.1016/j.ejor.2018.02.005

6. Afum B.O., Ben-Awuah E. A review of models and algorithms for surface-underground mining options and transitions optimization: some lessons learnt and the way forward. Mining, 2021, vol. 1, pp. 112–134. https://doi.org/10.3390/mining1010008

7. Flores G., Catalan A. A transition from a large open pit into a novel «macroblock variant» block caving geometry at Chuquicamata mine, Codelco Chile. Journal of Rock Mechanics and Geotechnical Engineering, 2019, vol. 11, no. 3, pp. 549–561.

8. Sokolov I.V., Smirnov A.A., Antipin Yu.G., Gobov N.V., Baranovskiy K.V., Nikitin I.V., Solomein Yu.M., Rozhkov A.A. Geo-technological aspects of large iron ore deposits development strategy. Problemy nedropolzovaniya [Subsoil Use Problems], 2014, vol. 3(3), pp. 113–125. (In Russ.)

9. Kaplunov D.R., Rylnikova M.V. Development of scientific and methodological foundations for sustainability of the functioning of mining-engineering systems, when introducing a new technological paradigm. Izvestiya Tulskogo gosudarstvennogo universiteta. Nauki o Zemle [News of Tula State University. Earth Sciences], 2020, no. 4, pp. 24–39. (In Russ.)

10. Sokolov I.V. Assessing efficiency of underground geotechnology, when providing the rationale for the strategy of combined mining of ore deposits. Gorny informatsionno-analiticheskiy byulleten (nauchno-tekhnichesky zhurnal) [Mining Informational and Analytical Bulletin (Scientific and Technical Journal)], 2011, no. S11, pp. 480–493. (In Russ.)

11. Gustafson A., Schunnesson H., Paraszczak J., Shekhar G., Bergstróm S., Brãnnman P. Operator influence on the loading process at LKAB's iron ore mines. Journal of the Southern African Institute of Mining and Metallurgy, 2020, vol. 120, no. 3, pp. 191–202. DOI: 10.17159/2411-9717/376/2020

12. Antipin Yu.G., Baranovskiy K.V., Rozhkov A.A., Klyuev M.V. Overview of combined underground mining systems for ore deposits. Problemy nedropolzovaniya [Subsoil Use Problems], 2020, vol. 3(26), pp. 5–22. (In Russ.). DOI: 10.25635/2313-1586.2020.03.005

13. Rogov V.Yu. Assessment of the ferrous metallurgy development prospects in the Irkutsk Region based on the resources of the Eastern Sayans and innovative technologies. Vestnik Zabaikalskogo gosudarstvennogo universiteta [Bulletin of Transbaikal State University], 2022, vol. 28, no. 2, pp. 19–28. (In Russ.). DOI: 10.21209/2227-9245-2022-28-2-19-28

14. Trubetskoy K.N., Kaplunov D.R., Tomaev V.K., Pomelnikov I.I. Resource-reproducing and ecologically balanced geotechnologies for comprehensive exploitation of mineral deposits in the area of the Kursk Magnetic Anomaly. Gornyi zhurnal [Mining Journal], 2014, no. 8, pp. 45–49. (In Russ.)

15. Svartsjaern М., Saiang D. Conceptual numerical modeling of large-scale footwall behavior at the Kiirunavaara Mine, and implications for deformation monitoring. Rock Mechanics and Rock Engineering, 2016, no. 49, pp. 943–960. DOI: 10.1007/s00603-015-0750-x

16. Sokolov I.V., Smirnov A.A., Antipin Yu.G, Nikitin I.V., Baranovskiy K.V. Underground geotechnology for combined mining of a large iron ore deposit. Izvestiya vysshikh uchebnykh zavedenii. Gornyi zhurnal [Minerals and Mining Engineering], 2014, no. 7, pp. 25–32. (In Russ.)

17. Savich I.N. Problems of using systems with forced caving in underground mining of ore deposits. Gorny informatsionno-analiticheskiy byulleten (nauchno-tekhnichesky zhurnal) [Mining Informational and Analytical Bulletin (Scientific and Technical Journal)], 2014, no. S1, pp. 366–373. (In Russ.)

18. Lobanov E.A., Eremenko A.A. Mining of under-pit ore reserves at the Oleniy Ruchey deposit. Vestnik Kuzbasskogo gosudarstvennogo tekhnicheskogo universiteta [Bulletin of Kuzbass State Technical University], 2021, no. 4(146), pp. 86-95. (In Russ.). DOI: 10.26730/1999-4125-2021-4-86-95.

19. Rusin E.P., Stazhevskiy S.B. About the current state and prospects of the Swedish version of the ore mining system with sublevel caving. Interekspo Geo-Sibir [Interexpo Geo-Siberia], 2017, vol. 2, pp. 112–116. (In Russ.)

20. Shamiev Zh.B., Alibaev A.P. Technology of combined mining of under-pit reserves by a system of sub-level caving with sectional breaking and end-cutting of ore through a slot. Sovremennye problemy mekhaniki sploshnykh sred [Modern Problems of Continuum Mechanics], 2010, no. 12, pp. 62–70. (In Russ.)

21. Shekhar G., Gustafson А. Draw control strategies in sublevel caving mines - A baseline mapping of LKAB’s Malmberget and Kiirunavaara mines. Journal of the Southern African Institute of Mining and Metallurgy, 2018, vol. 118, no. 7, pp. 723–733.

22. Tan Y., Guo M., Hao Y., Zhang C., Song W. Structural parameter optimization for large spacing sublevel caving in Chengchao Iron Mine. Metals, 2021, no. 11, p. 1619. https://doi.org/10.3390/met11101619

23. Brunton I.D., Fraser S.J., Hodgkinson J.H., Stewart P.C. Parameters influencing full scale sublevel caving material recovery at the Ridgeway gold mine. International Journal of Rock Mechanics and Mining Sciences, 2010, vol. 47, no. 4, pp. 647–656.

24. Kaplunov D.R. Problems of combined geotechnology in sustainable ecologically balanced subsoil development. Gornyi zhurnal [Mining Journal], 2018, no. 1, pp. 14–17. (In Russ.) DOI: 10.17580/gzh.2018.01.01

25. Mazhitov A.M. Assessment of the extent of man-induced transformation of a subsoil block in upward mining using ore and host rock caving. Gornaya promyshlennost [Mining Industry], 2021, no. 4, pp. 113–118. (In Russ.) DOI: 10.30686/1609-9192-2021-4-113-118.

26. Sokolov I.V., Gobov N.V., Smirnov A.A., Medvedev A.N. Integrated environmentally-oriented underground geotechnology of mining and beneficiation of iron ores. Ekologiya i promyshlennost Rossii [Ecology and Industry of Russia], 2013, no. 9, pp. 16–20. (In Russ.)

27. Wang Zhenwei, Song Gaofeng, Ding Kuo. Study on the ground movement in an open–pit mine in the case of combined surface and underground mining. Advances in Materials Science and Engineering, 2020, vol. 2020, ID 8728653, DOI: 10.1155/2020/8728653

28. Bondarenko A.A., Sharipov R.Kh. Experience and comparative analysis of operating efficiency of diesel and electric loading and delivery machines. Izvestiya Tulskogo gosudarstvennogo universiteta. Nauki o Zemle [News of Tula State University. Earth Sciences], 2021, no. 4, pp. 246–257. (In Russ.) DOI: 10.46689/2218-5194-2021-4-1-246-257

29. Casteel K. Underground haulage equipment trends. Engineering and Mining Journal, 2008, April, pp. 773–775.

30. Li J.–G., Zhan K. Intelligent mining technology for an underground metal mine based on unmanned equipment. Engineering, 2018, no. 4, pp. 381–391.

31. Smirnov A.A., Baranovsky K.V., Rozhkov A.A., Solomein Yu.M. Cut-and-fill stoping using mixed backfill. Gorny informatsionno-analiticheskiy byulleten (nauchno-tekhnichesky zhurnal) [Mining Informational and Analytical Bulletin (Scientific and Technical Journal)], 2021, no. 5-1, pp. 62–76. (In Russ.) DOI: 10.25018/0236_1493_2021_51_0_62

32. Guo L., Wang H., Sun X., Zhou J., Liang X. Design and construction of a combined underground paste backfilling and surface paste storage system in Baiyinchagan Polymetallic Mine. Proceedings of the 20th International Seminar on Paste and Thickened Tailings, Beijing University of Science and Technology, Beijing, 2017, pp. 346–357, https://doi.org/10.36487/ACG_rep/1752_38_Guo

33. Wu J. Research on sublevel open stoping recovery processes of inclined medium thick orebody on the basis of physical simulation experiments. PLoS ONE, 2020, vol. 15(5), e0232640. DOI: 10.1371/journal.pone.0232640

34. MacNeil J. A stochastic optimization formulation for the transition from open pit to underground mining. Optimization and Engineering, 2017, vol. 18, pp. 793–813. DOI: 10.1007/s11081-017-9361-6

35. Pourrahimian Y., Askari Nasab H., Tannant D. A multi-step approach for block-cave production scheduling optimization. International Journal of Mining Science and Technology, 2013, vol. 23, pp. 739–750. DOI: 10.1016/j.ijmst.2013.08.019.

36. Neverov S.A., Konurin A.I., Shaposhnik Yu.N. Safety of stoping operations during sublevel excavation with collapse in tectonically stressed massifs. Interekspo Geo-Sibir [Interexpo Geo-Siberia], 2021, vol. 2, no. 3, pp. 311–321. (In Russ.). DOI: 10.33764/2618-981X-2021-2-3-311-321.

37. Dutta S., Lal A., Chittora V., Chordia L., Tailor D. Ore dilution control practiced at Sindesar Khurd Mine of Hindustan Zinc Ltd. Proceedings of the International Seminar on Design Methods in Underground Mining, Australian Centre for Geomechanics, Perth, 2015, pp. 553–568. https://doi.org/10.36487/ACG_rep/1511_35_Dutta

38. Sokolov I.V. Antipin Yu.G., Nikitin I.V. Basic principles and assessment criteria of technological strategy for underground mining in transition zones. Gorny informatsionno-analiticheskiy byulleten (nauchno-tekhnichesky zhurnal) [Mining Informational and Analytical Bulletin (Scientific and Technical Journal)], 2017, no. 9, pp. 151–160. (In Russ.). DOI: 10.25018/0236-1493-2017-9-0-151-160

39. Sokolov I.V., Antipin Yu.G., Nikitin I.V. Metodologiya vybora podzemnoy geotekhnologii pri kombinirovannoy razrabotke rudnykh mestorozhdeniy: monografiya [Methodology for choosing underground geotechnology in the combined mining of ore deposits: monograph]. Yekaterinburg: Ural University Publishing House, 2021, 340 p. (In Russ.)

40. Sokolov I.V., Smirnov A.A., Rozhkov A.A. Technology of blasting of strong valuable ores with ring borehole pattern. JournalofMiningInstitute, 2019, vol. 237, pp. 285–291. DOI: 10.31897/PMI.2019.3.285